24-hour Service Hotline : 0533-8678777 Company Address : No. 5, nanzhi first road, science and technology industrial park, zibo city Purchasing Department: 15805338006(AN) E-mail:sdphkj@163.com Home Page:www.unicard-crsc.cn
1, interspersed with planning, such as: adjacent traffic related facilities, outstanding visual or not, etc.
2, interspersed with structure, such as the width of all import and export, the number of lanes, the penetration Angle, etc.
3, traffic conditions, such as: traffic volume, left and right turn rate, large car with rate, the number of crossing the line, interspersed with Angle, etc.
4, to fully consider the pedestrian waiting for the moment to a red light and green light time of passage, if the pedestrian red light time is too long, will cause a part of the pedestrian red light, green light time too short, will form a pedestrian crossing the road is not convenient.
5, contact crossing lanes distribution concluded release way, such as import lanes interspersed with intersection each direction is less, lane not satisfied vehicles waiting for the signal to turn left and go straight direction, then you can think by the import take turns.
6, to think about intersection traffic flow is inconsistent, the condition of asymmetry, etc, reasonable allocate recuperate phase moments, such as the asymmetry of left turn traffic, can be together after the release of transfer must be time left, to suspend the traffic flow smaller has left traffic instructions, traffic flow of sustained release, and can release the imported straight vehicles.